Make trade handoffs visible in the schedule
Water-loss reconstruction often moves from framing and insulation to drywall, paint, cabinets and flooring. For Mansfield projects, specify what each trade needs from the previous stage so a delayed inspection or unresolved surface condition is addressed before new finishes are installed.








