McKinney, Texas

Shower Remodeling in McKinney, TX

Custom shower remodeling with demolition, waterproofing, tile installation, niches, benches, plumbing fixtures, drains and frameless glass enclosures.

Request a Free Shower Remodeling Estimate in McKinney

Real Customer Reviews ★★★★★

5.0 Google Rating · Based on 38 reviews

View Our Google Profile →
J
Jonathan MirandaGoogle review
★★★★★

Professional, reliable and detail-oriented from planning through completion. The craftsmanship and finished work exceeded expectations.

Read review summary · Source: Google →
J
Jeff WinkelmanGoogle review
★★★★★

Top-notch communication, professionalism and attention to detail on a Jack-and-Jill bathroom renovation.

Read review summary · Source: Google →
N
Nextdoor NeighborGrand Prairie, TX
★★★★★

“Fair price for great work. Definitely recommend them for general repairs and maintenance.”

View public recommendation →
★
All Customer ReviewsGoogle, Nextdoor and public sources
★★★★★

Read customer feedback with the original source identified for every review.

View All Customer Reviews →

Shower remodeling / McKinney, Texas

Drain and slope are linked decisions. A project completed in planned phases.

For shower remodeling in McKinney, this guide focuses on drain and slope are linked decisions. Use it to discuss the conditions at your property and compare the proposed work.

Drain and slope are linked decisions

The drain location and selected base affect tile cuts and finished elevations. Establish a compatible slope and waterproof connection before the tile pattern or glass opening is finalized.

A project completed in planned phases

If work will occur in stages, define the temporary condition between phases and protect completed surfaces before the next trade arrives. Coordinate material batches, storage and the approvals that release the next stage.

Compare the components behind the finished work

Bonded sheet waterproofing — McKinney
Bonded sheet waterproofing — McKinney

Schluter KERDI

Bonded sheet waterproofing

A sheet membrane can form the waterproof layer beneath a compatible tiled shower assembly.

Selection check
Seams, corners, penetrations, drain connections and the selected mortar must follow the system instructions. Tile and grout alone are not the waterproof layer.

Coverage and scope

KERDI membranes have a 10-year limited warranty; eligible complete-system programs may differ. Confirm all component and installation requirements.

Official reference

Ceramic and porcelain tile — McKinney
Ceramic and porcelain tile — McKinney

Daltile

Ceramic and porcelain tile

Tile options differ in size, finish, water absorption and approved location. A wall-only tile is not automatically suitable for a floor.

Selection check
Review the exact tile’s use rating, wet-area suitability, substrate, grout and movement-joint requirements before selecting the pattern.

Coverage and scope

Daltile’s standard tile warranty is limited; specialty collections and system programs have separate terms. Request the exact product warranty.

Official reference

Structural connectors and fasteners — McKinney
Structural connectors and fasteners — McKinney

Simpson Strong-Tie

Structural connectors and fasteners

Connectors transfer forces between specified framing members when installed with the correct compatible fasteners.

Selection check
Selection depends on the loads, wood treatment, exposure and connection geometry. Decorative appearance does not establish structural capacity.

Coverage and scope

Product documentation governs the selected connector. A hardware warranty does not replace structural design or cover an unspecified assembly.

Official reference

01

Review the existing condition

The drain location and selected base affect tile cuts and finished elevations. Bring photographs, dimensions and any relevant previous repair records to the discussion.

02

Define the complete selection

Compare bonded sheet waterproofing, ceramic and porcelain tile, structural connectors and fasteners. Specify the selected components and the preparation they require.

03

Agree on the handoff

Name the drain and base system in the scope. Coordinate material batches, storage and the approvals that release the next stage.

Questions for this project

What should be decided before splitting the work into phases?

Agree on safe interim conditions, usable areas, material storage, trade handoffs and how completed work will be protected. Identify any component that must be installed together rather than treating every item as independently schedulable.

What needs to be confirmed before shower remodeling begins?

Name the drain and base system in the scope. The written scope should also identify the selected products, work boundaries, required trade coordination and approval steps for changes.

Are the listed manufacturers included in every estimate?

No. These are references for comparing product categories. Availability, suitability, the exact model and the actual supplier must be confirmed for the property. A reference does not imply certification, stock or a brand affiliation.

Manufacturer coverage: Terms apply to the exact product and eligible application. Material coverage, complete-system programs and installation workmanship are different obligations. Request the current written warranty and care instructions; a warranty term is not a guaranteed service life. Generic illustrations are original explanatory artwork, not branded packaging.

Discuss the conditions at your property.
Include the project address, relevant photos and your priorities.

Request your estimate →

Local Shower Remodeling Services

The drain location and selected base affect tile cuts and finished elevations. Establish a compatible slope and waterproof connection before the tile pattern or glass opening is finalized.

If work will occur in stages, define the temporary condition between phases and protect completed surfaces before the next trade arrives. Coordinate material batches, storage and the approvals that release the next stage.

What the Service May Include

  • Walk-in shower conversions
  • Waterproof shower systems
  • Custom tile walls and floors
  • Built-in niches and benches
  • Plumbing fixture upgrades
  • Frameless glass enclosures

Planning the Project

Scheduling, access, protection, materials, trade coordination, cleanup and any hidden conditions are reviewed before work begins.

Other Services in McKinney

Shower Remodeling Near McKinney

Shower Remodeling FAQ

What is included in a custom shower remodel?

A complete shower remodel may include demolition, framing repairs, plumbing changes, waterproofing, tile installation, niche or bench construction, drain work, fixtures and glass installation.

Can a bathtub be converted into a walk-in shower?

Yes. Many existing tub areas can be converted into walk-in showers after evaluating the drain location, plumbing, wall framing, waterproofing requirements and available dimensions.

How long does a shower remodeling project usually take?

Many custom shower projects take about one to three weeks depending on demolition, repairs, waterproofing, tile complexity, material availability and glass fabrication.

Do you provide shower remodeling in McKinney?

Yes. Luna General Contractors serves homes and businesses throughout McKinney and nearby communities.

Start Your Project

Request Your Free Estimate

Tell us about your property and the work you have in mind. We can discuss the scope, access, material selections and next steps.

☎