Plano, Texas

Whole Home Remodeling in Plano, TX

Complete home remodeling with coordinated planning, selective demolition, layout changes, kitchens, bathrooms, flooring, drywall, painting, carpentry, doors, lighting, plumbing fixtures and finish work.

Request a Free Whole Home Remodeling Estimate in Plano

Real Customer Reviews ★★★★★

5.0 Google Rating · Based on 38 reviews

View Our Google Profile →
J
Jonathan MirandaGoogle review
★★★★★

Professional, reliable and detail-oriented from planning through completion. The craftsmanship and finished work exceeded expectations.

Read review summary · Source: Google →
J
Jeff WinkelmanGoogle review
★★★★★

Top-notch communication, professionalism and attention to detail on a Jack-and-Jill bathroom renovation.

Read review summary · Source: Google →
N
Nextdoor NeighborGrand Prairie, TX
★★★★★

“Fair price for great work. Definitely recommend them for general repairs and maintenance.”

View public recommendation →
★
All Customer ReviewsGoogle, Nextdoor and public sources
★★★★★

Read customer feedback with the original source identified for every review.

View All Customer Reviews →

Whole-home remodeling / Plano, Texas

Closeout should cover the complete remodel. A project completed in planned phases.

For whole-home remodeling in Plano, this guide focuses on closeout should cover the complete remodel. Use it to discuss the conditions at your property and compare the proposed work.

Closeout should cover the complete remodel

Many separate products and trades contribute to the finished home. Organize care instructions, manufacturer warranties and final scope records so the owner can maintain each system after construction.

A project completed in planned phases

If work will occur in stages, define the temporary condition between phases and protect completed surfaces before the next trade arrives. Coordinate material batches, storage and the approvals that release the next stage.

Compare the components behind the finished work

Factory-built cabinetry — Plano
Factory-built cabinetry — Plano

KraftMaid

Factory-built cabinetry

Cabinet boxes, doors, drawers and storage accessories need to work with the room’s measured layout and appliances.

Selection check
Review fillers, finished end panels, support, hardware clearances and installation responsibility. Approve a physical door sample before ordering.

Coverage and scope

KraftMaid provides limited lifetime coverage for eligible residential cabinetry; commercial and other exclusions apply.

Official reference

Laminated wood flooring — Plano
Laminated wood flooring — Plano

Mohawk RevWood

Laminated wood flooring

Laminate flooring combines a decorative surface and engineered core; suitability varies by product and installation conditions.

Selection check
Identify the exact RevWood collection, approved underlayment, subfloor moisture limits, expansion space and wet-area restrictions.

Coverage and scope

Coverage varies by collection. Read the selected residential or commercial warranty; water-related marketing does not cover every flood or plumbing loss.

Official reference

Interior acrylic finish — Plano
Interior acrylic finish — Plano

Sherwin-Williams Duration Home

Interior acrylic finish

Interior acrylic coatings offer different sheens for walls and trim; preparation and the underlying surface affect the result.

Selection check
Select sheen, primer where required, color samples and repair boundaries. A paint-and-primer label does not eliminate every separate primer step.

Coverage and scope

The product lists a limited lifetime warranty. Read its remedy and exclusions; it is not a promise that every painted surface will remain unchanged for life.

Official reference

01

Review the existing condition

Many separate products and trades contribute to the finished home. Bring photographs, dimensions and any relevant previous repair records to the discussion.

02

Define the complete selection

Compare factory-built cabinetry, laminated wood flooring, interior acrylic finish. Specify the selected components and the preparation they require.

03

Agree on the handoff

Collect product identification and completion records. Coordinate material batches, storage and the approvals that release the next stage.

Questions for this project

What should be decided before splitting the work into phases?

Agree on safe interim conditions, usable areas, material storage, trade handoffs and how completed work will be protected. Identify any component that must be installed together rather than treating every item as independently schedulable.

What needs to be confirmed before whole-home remodeling begins?

Collect product identification and completion records. The written scope should also identify the selected products, work boundaries, required trade coordination and approval steps for changes.

Are the listed manufacturers included in every estimate?

No. These are references for comparing product categories. Availability, suitability, the exact model and the actual supplier must be confirmed for the property. A reference does not imply certification, stock or a brand affiliation.

Manufacturer coverage: Terms apply to the exact product and eligible application. Material coverage, complete-system programs and installation workmanship are different obligations. Request the current written warranty and care instructions; a warranty term is not a guaranteed service life. Generic illustrations are original explanatory artwork, not branded packaging.

Discuss the conditions at your property.
Include the project address, relevant photos and your priorities.

Request your estimate →

Local Whole Home Remodeling Services

Many separate products and trades contribute to the finished home. Organize care instructions, manufacturer warranties and final scope records so the owner can maintain each system after construction.

If work will occur in stages, define the temporary condition between phases and protect completed surfaces before the next trade arrives. Coordinate material batches, storage and the approvals that release the next stage.

What the Service May Include

  • Whole-house planning and phased renovations
  • Selective demolition and layout improvements
  • Kitchen and bathroom remodeling
  • Flooring, drywall, texture and painting
  • Doors, trim, cabinets and finish carpentry
  • Electrical, plumbing and HVAC coordination
  • Permits, inspections and project sequencing
  • Final punch-list, cleanup and walkthrough

Planning the Project

Scheduling, access, protection, materials, trade coordination, cleanup and any hidden conditions are reviewed before work begins.

Other Services in Plano

Whole Home Remodeling Near Plano

Whole Home Remodeling FAQ

What is included in a whole home remodel?

The scope may include layout changes, kitchens, bathrooms, flooring, drywall, texture, painting, doors, trim, cabinets, lighting, plumbing fixtures and other coordinated improvements selected for the property.

Can a whole home remodel be completed in phases?

Yes. Larger renovations can be divided into logical phases based on budget, material availability, access to the home and the order required for inspections and trade work.

Can homeowners remain in the property during construction?

It depends on the extent of demolition, utility interruptions, dust control and how many rooms are affected. Some phased projects allow partial occupancy, while extensive renovations may require temporary arrangements.

How are multiple trades coordinated during a full renovation?

The project is sequenced so demolition, framing, rough plumbing and electrical, inspections, drywall, cabinets, flooring, painting and finish work occur in the proper order.

Do you provide whole home remodeling in Plano?

Yes. Luna General Contractors serves homes and businesses throughout Plano and nearby communities.

Start Your Project

Request Your Free Estimate

Tell us about your property and the work you have in mind. We can discuss the scope, access, material selections and next steps.

☎