What the Service May Include
- Walk-in shower conversions
- Waterproof shower systems
- Custom tile walls and floors
- Built-in niches and benches
- Plumbing fixture upgrades
- Frameless glass enclosures
Cedar Hill, Texas
Custom shower remodeling with demolition, waterproofing, tile installation, niches, benches, plumbing fixtures, drains and frameless glass enclosures.
A Cedar Hill shower estimate should begin with the existing enclosure, wall and floor condition, drain location, plumbing access and the dimensions available for tile, niches and glass. Those conditions determine whether the scope includes framing repair, plumbing changes or substrate correction before waterproofing.
Luna's documented Cedar Hill tub-and-shower project provides a local reference for demolition, wall preparation, large-format tile, a recessed niche and surrounding finish work. A new property is still measured and priced from its own conditions.
Verified Local Project
The project record documents removal of an older fiberglass enclosure, preparation of the shower walls, installation of large-format tile and a recessed niche, plus related lighting and finish work.

Shower tile depends on the assembly behind it. The scope should identify damaged framing or wallboard, the approved tile substrate, waterproofing transitions, niche location and fixture penetrations before tile begins. Glass dimensions are confirmed only after the finished tile surfaces are established.
Explore bathroom remodeling services → Request a property-specific estimate →
The Cedar Hill estimate should define demolition, substrate repair, plumbing coordination, waterproofing, tile and niche layout, edge finishing, glass responsibility, protection and cleanup.
A complete shower remodel may include demolition, framing repairs, plumbing changes, waterproofing, tile installation, niche or bench construction, drain work, fixtures and glass installation.
Yes. Many existing tub areas can be converted into walk-in showers after evaluating the drain location, plumbing, wall framing, waterproofing requirements and available dimensions.
Many custom shower projects take about one to three weeks depending on demolition, repairs, waterproofing, tile complexity, material availability and glass fabrication.
Yes. Luna General Contractors serves homes and businesses throughout Cedar Hill and nearby communities.